Dried Fig Filling Line
Puts the sorted and processed figs through a final check and fills them into crates.
- stations
- 301 stations
- machine models
- 302 machine models
- processes on the Dried Fig line
- 503 processes on the Dried Fig line
- tonnes / hour
- 1-304 tonnes / hour
01Station chain
The product moves in this order
The Dried Fig Filling Line consists of 3 stations. The machine working at each station has its own page.

Station 01
Balanced Product Feed Doser
Feeds the product to the filling point in an even flow.

Station 02
Illuminated Sorting Conveyor
The illuminated sorting belt where the final visual check is made before filling.

Station 03
Crate Filling Stand
Fills the product into crates while shortening the drop height, completing the line.
02Machines
Dried Fig Filling Line machines
03Dried Fig processes
Other lines for the same product
04Quote
Quote for the Dried Fig Filling Line
Send your target capacity and facility dimensions; we will come back with a quote covering the station list, lead time and price.
- Phone
- +90 232 472 22 50









