Skip to content

For the latest 2026 processing line technology, get in touch

Date

Date Hair Singeing Line

A line that removes the fine hairs on the date surface with a flame; the product passes through the singeing unit while travelling on the shaker and is carried on to the next station by conveyor.

stations
301 stations
machine models
102 machine models
processes on the Date line
403 processes on the Date line
tonnes / hour
1-304 tonnes / hour
Date Hair Singeing Line

01Station chain

Main machines on the line

The Date Hair Singeing Line consists of 3 stations. The machine working at each station has its own page.

  1. Feeding Conveyor

    Station 01

    Feeding Conveyor

    Carries the product to the line entry in a steady flow.

  2. Station 02

    Transfer Shaker

    Spreads the product into a single layer by vibration and feeds it evenly to the singeing unit.

  3. Station 03

    Hair Singeing Unit

    The fine hairs on the product surface are removed with a controlled flame; a flue extraction carries the smoke outside.

02Machines

Date Hair Singeing Line machines

04Quote

Quote for the Date Hair Singeing Line

Send your target capacity and facility dimensions; we will come back with a quote covering the station list, lead time and price.